News categories
NewsLocation:Home >> News
Analysis of stainless steel terminal block connection process
  Published:2013-05-14 10:06:58   Views:

Elinker Electric limited has been is committed to wiring Terminal, and wiring board series of manufacturing production, are products has LC series plug dial type wiring Terminal, and LG series straight welding type wiring Terminal, and LS series spring type wiring Terminal, and LW series fence type wiring Terminal, and LZ Series Terminal, and e series type nude Terminal, and box type crimping wiring Terminal, and plate crimping wiring Terminal, and trolley/track installed Terminal, and JDG grounding copper row Terminal, and switch volume, and Anti-interference series terminals, and other types of terminal blocks, used in electrical equipment, complete sets of electrical installations, industrial automation, refrigeration/transport equipment and power equipment and other diverse fields.

 

Terminal block connection process for stainless steel: stainless steel earthing terminal head back-end connections for a period of not less than 150 mm in length φ 16 bars, two dowels, straight and right angle rod, threaded cavity dowels required and sector segregation, isolation is not less than 5 mm in length. Length of dowels can be determined according to the realities of construction. Pile foundation earthing earthing terminal settings: each post should have a grounding in earthing terminal steel, steel grounding in earthing terminal in the cap ring.

 

Elinker Electric stainless steel Terminal frequently asked questions and solutions proposed: to prevent ground pile foundation reinforcement and ground terminal ground ground terminal steel bars were accidentally, when steel pile foundation construction of earthing earthing terminal identification (brushing red paint) identifies the head of rebar welded to prevent failure due to pile head breaking. Comprehensive earthing earthing terminal requirements, there is a earth ground terminal steel. Grounding grounding Terminal reinforced and Pier column reinforced welding, Pier column reinforced and cover beam reinforced welding, cover beam Shang pre-buried grounding grounding Terminal, stay frame beam Hou, and beam Shang pre-buried of grounding grounding terminal with stainless steel connection line connection, beam and beam Zhijian also with stainless steel connection line connection, beam again and another end coping with stainless steel connection line connection, again and Pier column reinforced connection, and drilling pile reinforced connection.