Inverter debug the basic methods and procedures:
a.drive's ground terminal to ground.
b.the power input terminal of the inverter to the power leakage protection switch.
c.Check the inverter display window factory display is normal, if incorrect, should be reset, and failing that, to be returned.
d.familiar with the inverter operation keys. The inverter are running (RUN), stop (STOP), programming (PROG), the data confirm the P (DATAPENTER), increase (UP ▲), reduced (the DOWN ") 6 key, different inverter operation the key definition is basically the same. In addition, some inverter monitoring (MONITORPDISPLAY), reset (rESET), jog (JOG), shift (SHIFT) the function keys.